1·Before installing, flush pipe line to remove scale and debris.
在安装之前,冲洗管道,清除水垢和碎片。
2·There is no water and most of the time pipe line and taps are stolen.
没有水,大多数时候管道或笼头被偷了。
3·Open the relevant valves on the oil pipe line and the water pipe line.
打开油管管路和水管管路上有关的阀门。
4·Close the relevant valves on the oil pipe line and the water pipe line.
关闭相关的油管管路和水管管路上的阀门。
5·Maximum continuous flow based on pipe line velocity of 20 ft. per second.
最大持续流量以管路流速每秒20英尺为计算基础。
6·The source of pipe line secondary stress check condition is the stability condition.
管道二次应力校核条件来源于结构的安定性条件。
7·The oil and gas pipe line through fault or landslide area is easy to be damaged by earthquake.
油气管道通过断层和滑坡地带,容易遭受地震破坏。
8·The X grace steel sheet is used as main material for SAW straight weld pipes for pipe line purpose.
X级管线钢板材是生产直缝埋弧焊管的主要原材料。
9·This air valve is automatic device, it can exhaust air in the pipe line to reduce energy loss of system.
本阀属于自动阀类,能自动排除管路内的气体,减少管路系统的能量损失。
10·Protective gas system: pipe line from the protective gas generation station to reducing annealing furnace.
保护气系统:从保护气体发生站至还原退火炉的管道。